MENU

Navigation

Satisfied Customers


Letters of Recognition


- Sutter

- Rouse

- Jay Leno Garage

- Hensel Phelps

- Kaiser Permanente

- HMH Builders

- Project References

- Builders Square

- Xerox

- Dreyer Medical

- Intertech FLooring

- Marshall Industries

- Pelican Cove

- Rudolph Commercial

- S.P.S. Company

- Seven

- Mallard Cove

- W.L. Marocco

- Bridger Construction

- DuPont Flooring

- Hoffman Structures

- JA Jones / Absher

- Standford Medical Center

-

Case Studies


At the Redwood City Pioneer Hi-Bred International facilities, there was 11,650 square feet of failing resilient floor covering. Floor Seal Technology, Inc. was specifically called in to investigate the problem.

When the New Santa Clara Kaiser Permanente Building was propsed for construction, Floor Seal Technology, Inc. was there from the start.

At the Boeing Interior Mockup Center in Renton, Washinton, there was moisture vapor emission problem affecting 14,000 square feet of floor space. Floor Seal Technology, Inc. was called in to correct the problem.

- Boeing

Round Table Pizza encountered flooring failures in several stored on their existing dining room floors. They needed a solution which was not only cost effective, but also needed to be installed quickly with minimal downtime.

In Buildings 3 and 8, there was a moisture vapor emission problem affecting over 15,000 square feet of floor space to receive resilient floor covering. Floor Seal Technology, Inc. remedied the problem by installing our MES100 Vapor Emission & Alkalinity Control System.

Projects using MES 100: